Skip to content
FacebookTwitterPinterestInstagram
01522 243170info@fmslincoln.co.ukMonday – Friday 8 AM – 5 PM
Facility Management Services Lincoln
Facility Management Services Lincoln
  • Home
  • About Us
    • About Us
    • Testimonials
  • Services
    • Building Work
      • DDA Approved Extensions
      • School Extensions
      • General Building
      • General Repairs of Fixtures
    • Education
      • Emergency Call Outs
      • Roofing Works
      • Fencing Works
      • Re-surfacing
      • Electrical
      • Decorations
    • Insurance Works
    • Reactive Repairs
    • General Maintenance
    • Installation and Removal
    • Temporary Mobile Classrooms for Schools
    • Park Home Maintenance and Repairs
    • Internal Refurbishments
  • Case Studies
  • Contact
Search:
  • Home
  • About Us
    • About Us
    • Testimonials
  • Services
    • Building Work
      • DDA Approved Extensions
      • School Extensions
      • General Building
      • General Repairs of Fixtures
    • Education
      • Emergency Call Outs
      • Roofing Works
      • Fencing Works
      • Re-surfacing
      • Electrical
      • Decorations
    • Insurance Works
    • Reactive Repairs
    • General Maintenance
    • Installation and Removal
    • Temporary Mobile Classrooms for Schools
    • Park Home Maintenance and Repairs
    • Internal Refurbishments
  • Case Studies
  • Contact

Fleetwood Primary School – Perimeter Fence Replacement

You are here:
  1. Home
  2. Project
  3. Fleetwood Primary School – Perimeter…

Client: Lincolnshire County Council
Project Duration: 2 Weeks
Completion Date: May 2019

Removal of 175mts of existing timber fencing and concrete posts, cut back shrubbery and replace with new 2.4 mts high nylofor profile mesh fencing.

The works were carried out during the school holidays.

  • Before
  • After

Project navigation

PreviousPrevious project:Heckington Primary School – Replacement of Two ConservatoriesNextNext project:Belton Lane, Children’s Centre, Grantham

More Projects

Fire Damaged Stable Clearance – Christchurch, Wisbech

Mobile Office Relocation – East Lindsey District Council, Skegness

Refurbishment of Council Office, Louth

Belton Lane, Children’s Centre, Grantham

Heckington Primary School – Replacement of Two Conservatories

Park Home – Insurance Repair Car Impact Damage

Park Home – Insurance Repair Water Ingress Around Windows

Southrey Church – Compost Toilet

Facility Management Services
We have worked hard to obtain the Constructionline and Chas accreditations which allows us to prove we are a competent and responsible contractors when it comes to H&S. Plus, it has lead us to become one of the leading contractors who can carry out work for Lincolnshire County Council, Vinci Facilities and Kier plus other authorities and directly with schools.
Contact Us
  • Phone:
    01522 243170 or 07934 838839
  • We are open:
    Mon - Fri: 8 AM - 5 PM
Go to Top